Development Fees

Project Development/Charges/Fees

(Effective January, 2017)

PLAN CHECK CHARGES

  • $400.00 Minimum Charge + per Connection + Engineering Charges
  • $5.25 per Connection
  • $(Actual Engineering Charge, if applicable)
  • $150.00 Fire Flow Letter Submittal
  • $300.00 Fire Flow Test

CAPACITY CHARGES (Includes the Water Meter Up to 2-Inch)

  • Up to 1 Inch $7,500.00
  • 1-1/2 Inch $16,000.00
  • 2 Inch $25,000.00
  • 3 Inch $45,000.00
  • 4 Inch $80,000.00
  • 6 Inch $150,000.00
  • 8 Inch $280,000.00
  • 10 Inch $450,000.00
  • Fire Hydrant Connection 750.00

WATER SERVICE INSTALLATION CHARGE

  • Up to 1 Inch (Actual Cost)
  • 1-1/2 Inch (Actual Cost)
  • 2 Inch (Actual Cost) (W/Compound Meter)
  • >2 Inch (Actual Cost) Service abandonment/relocations (Actual Cost)
  • 1” Meter Fee $400.00

CONSTRUCTION WATER

  • Fire Hydrant Usage – as metered $2.28 per unit (Unit=100 cf=748 gals)
  • Tank Trucks (As metered)
  • Refundable Deposit on Hydrant Meter $3,000.00 deposit + $5.00/Day
  • Un-metered Miscellaneous Water Permit $200.00 (Annually + $3.00 per 1,000 gals)
  • Back flow Device/Initial Test $100.00

INSPECTION CHARGES

  • Minimum $950.00 + Per Connection + Per Main Tie-In
  • Plus Per Connection $200.00 
  • Pipeline/Main Line $ 2.00 Per linear ft. ($200.00 Minimum)
  • Plus Per Main Tie-In $950.00 
  • Fire Sprinkler/Backflow Device $100.00
  • Fire Hydrant $250.00
  • Blow-Off Valves $200.00
  • Hydrostatic Pressure Test $300.00
  • Bacteriological Sample $300.00 (First Test)
  • Plus Each Additional Sample $150.00 (Additional Samples after first test)
  • Notification/Shutdown System $200.00

Labor – Weekend/Holiday /After Hours @ $185.00 per hour (2 hour minimum)

SAN JUAN WATER DISTRICT WHOLESALE CAPITAL FACILITIES FEES

Effective January 2021
(Separate Check – Make Payable to San Juan Water District for fees listed below)

  • 3/4" Service $1,423
  • 1″ Service $1,423
  • 1-1/2″ Service $2,844
  • 2″ Service $4,551
  • 3” Service $9,103
  • 4″ Service $14,223
  • 6″ Service $35,559
  • 8″ Service $51,206
  • 10″ Service $82,499
  • 12″ Service $122,327

Fees are due/payable upon approval and signature of final construction plans, with the exception of plan check fees which are due and non-refundable upon initial plan check. Development fees will be non-refundable after water system is installed. This fee schedule is subject to change at any time.

Water will not be served to the development until all fire hydrant meters loaned for the site have been returned to Orange Vale Water Company.